For the issue of construction of blocks at different stages, when will the proposed strata plan certificate application be submitted if any of the blocks have achieved the key structural recognition?
Home
For the issue of construction of blocks at different stages, when will the proposed strata plan certificate application be submitted if any of the blocks have achieved the key structural recognition?
Application for the proposed strata plan certificate can be submitted after all blocks reach the main structure stage provided the difference between the buildings is not significant (within 3 months all blocks reach the main structure stage).
TENDER PERKHIDMATAN SERAH URUS BAGI PENGURUSAN FAIL TERMASUK PENYEWAAN TEMPAT, PERKHIDMATAN PENGURUSAN, MENYELENGGARA DAN MENYIMPAN REKOD DAN FAIL SERTA PERKHIDMATAN PENGESANAN SEMULA (RETRIEVAL) UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (T03/2026)
TENDER PERKHIDMATAN SISTEM KESELAMATAN ICT (INTRUSION PREVENTION SYSTEM- IPS, FIREWALL DAN VIRTUAL PRIVATE NETWORK) UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (JKPTG)(T04/2026)
PERKHIDMATAN SEWA MILIK PERABOT TERMASUK PENYELENGGARAAN SELAMA 24 BULAN UNTUK KEGUNAAN PEJABAT KETUA PENGARAH, JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (SH 06/2026)
TENDER PERKHIDMATAN PENYELENGGARAAN SISTEM MYLAND DAN PEMBAHARUAN LESEN PERISIAN UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (JKPTG) BAGI TEMPOH 43 BULAN (T02/2026)