For the issue of construction of blocks at different stages, when will the proposed strata plan certificate application be submitted if any of the blocks have achieved the key structural recognition?
Home
For the issue of construction of blocks at different stages, when will the proposed strata plan certificate application be submitted if any of the blocks have achieved the key structural recognition?
Application for the proposed strata plan certificate can be submitted after all blocks reach the main structure stage provided the difference between the buildings is not significant (within 3 months all blocks reach the main structure stage).
PERKHIDMATAN PENYEWAAN, PEMBEKALAN, PENGHANTARAN,PENYELENGGARAAN DAN BACAAN METER SEMBILAN (9) UNIT MESIN PENYALIN DIGITAL HITAM PUTIH HEAVY DUTY DAN DUA (2) UNIT MESIN PENYALIN DIGITAL BERWARNA DAN HITAM PUTIH HEAVY DUTY, JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN NEGERI KEDAH (SH18/2025)
PERKHIDMATAN PENYEWAAN, PEMBEKALAN, PENGHANTARAN,PENYELENGGARAAN DAN BACAAN METER BAGI ENAM (6) UNIT MESIN PENYALIN DIGITAL HITAM PUTIH DAN BERWARNA (HEAVY DUTY) JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN NEGERI KELANTAN (SH17/2025)
PEROLEHAN PERKHIDMATAN PENYEWAAN, PEMBEKALAN, PENGHANTARAN DAN PENYELENGGARAAN LAPAN (8) UNIT MESIN PENYALIN UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN NEGERI TERENGGANU
PEROLEHAN PERKHIDMATAN PENILAIAN TAHAP KESELAMATAN ICT (SECURITY POSTURE ASSESSMENT-SPA) BAGI SISTEM MyLAND, PORTAL JKPTG DAN PERKAKASAN PUSAT DATA JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (SH15/2025)
PERKHIDMATAN PEMBERSIHAN RUANG PEJABAT, PEJABAT PEMBAHAGIAN PUSAKA (PPP) MUAR DAN PPP SEGAMAT, JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG) PERSEKUTUAN NEGERI JOHOR (SH08/2025)