Under Section 6 (1) of the Strata Management Act 2013, developers shall not sell parcels without first filing the Schedule of Parcels to the Commissioner of Building.
A Schedule of Parcels contains:
Location plans, levels and markings such as in Section 9 AHS
Parcels, joint property and accessory parcels
JUBL’s certification that the scheme can be subdivided
Certification from Architect/ Engineer that the building/ land parcel that will be built is according to approved plans.
SiFUS is a certificate by the State PTG as one of the pre-conditions for the application of strata titles. SiFUS will be issued by the State PTG once the original owner/ developer completes the land requirements.
Application for the proposed strata plan certificate can be submitted after all blocks reach the main structure stage provided the difference between the buildings is not significant (within 3 months all blocks reach the main structure stage).
TENDER PERKHIDMATAN SERAH URUS BAGI PENGURUSAN FAIL TERMASUK PENYEWAAN TEMPAT, PERKHIDMATAN PENGURUSAN, MENYELENGGARA DAN MENYIMPAN REKOD DAN FAIL SERTA PERKHIDMATAN PENGESANAN SEMULA (RETRIEVAL) UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (T03/2026)
TENDER PERKHIDMATAN SISTEM KESELAMATAN ICT (INTRUSION PREVENTION SYSTEM- IPS, FIREWALL DAN VIRTUAL PRIVATE NETWORK) UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (JKPTG)(T04/2026)
PERKHIDMATAN SEWA MILIK PERABOT TERMASUK PENYELENGGARAAN SELAMA 24 BULAN UNTUK KEGUNAAN PEJABAT KETUA PENGARAH, JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (SH 06/2026)
TENDER PERKHIDMATAN PENYELENGGARAAN SISTEM MYLAND DAN PEMBAHARUAN LESEN PERISIAN UNTUK JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (JKPTG) BAGI TEMPOH 43 BULAN (T02/2026)